skip to main content

Construction

Thank you to our construction partners, Otto Construction and Studio W Architects!

 
 
Otto Construction with two-tone diamond/box logo
Studio W logo with large red
the multi-purpose room covered in blue sealer attached to the CMU block cafeteria surrounded by gravel and rebar
a building interior with installed drywall with taping and striping and corrugated steel panels installed on the floor surrounded by wood framing
an interior of the kitchen with exposed wood framing and a newly installed vent
gravel pathways with rebar laid out alongside the CMU block wall of the cafeteria.
the interior of the multipurpose room with new drywall installed on the walls and an exposed metal roof with hanging light fixtures
two classroom buildings with blue horizontal siding and large square concrete pillars with dirt between the buildings
2 classroom buildings with blue painted horizontal siding and concrete columns.
an aerial view to the South with a wide angle view of the Paradise Elementary property with the 4 new buildings and many dirt paths surrounding the buildings.
An aerial view to the North East showing the multi-purose room and 3 classroom wings with metal roofing and wood siding with a large concrete ramp and dirt pathways
Aerial view to the South West showing the 3 classroom wings with metal roofing and installed siding with the cafeteria in the background surrounded by dirt
a building interior showing newly installed glass panels around a large door opening
a classroom interior painted and currently having white cabinets installed
a classroom exterior with steel framing and unpainted siding
a classroom interior with partial t-bar ceiling, painted white and blue
a freshly painted exterior of classroom building
an interior hallway with finished drywall and unfinished plywood flooring
an external view of the classroom building with unpainted siding, windows, exposed pilars and steal framing
a long concrete wall with two exterior buildings covered in unpainted siding and metal roofing
the exterior of the multipurpose room made of CMU block and exposed wood framing.  There is a large concrete ramp under construction
a large wall in the multipurpose room covered in plywood
a long interior hallway with an unfinished concrete floor and taped drywall
a classroom interior, painted blue and a concrete floor and windows in the wall
The side of a building with metal roofing and unpainted siding and windows
a large framed and insulated wall inside the multipurpose room
a large CMU block enclosure with an open awning on top for trash bin storage
wood frames and concrete poured for a retaining wall next to a classroom building
a row of rebar for a future retaining wall and classroom in the background with siding and windows complete
a large orange conduit sitting in a dirt trough
a teaching wall in a typical classroom with shelving and storage cabinets and a blue accent soffit above
a bathroom with new tile, blue and white, installed and a concrete floor
a large concrete stage in Building A with wood framed ceiling above the stage.
A large open classroom with drywall installed and taping in progress and exposed t-bar ceiling
A large CMU block building with concrete floor and large steel trusses with an exposed metal roof
the roof over the main office area showing roof sealant and ventilation pipes penetrating the roof
the inside of a classroom with windows and drywall installed and exposed wood framing roofing and ventilation ducts
New teaching wall casework being installed in a classroom covered in drywall with exposed ventilation
a large concrete stage with color dye splashed on the stage alongside a CMU block wall and a wood framed ceiling over the back of the stage
A set of concrete stairs leading up to a stage next to a CMU block wall
a steel overhang over doors and windows at the office area of Building A
the front of Building A and office area ready for siding and window glazing with structural steel for covered doorway
the two gable ends of Building B with partial siding and ready for roofing
the South side of Building B showing new window glazing and siding
the interior of a classroom with dryway and exposed ceiling and network wiring
New window glazing installed in a classroom
The interior of a classroom showing drywall and exposed ceiling and ventilation
Large retaining walls that are set for concrete stairs to be installed
a large curved ramp heading up to Building A where the outdoor stage area is visible
a large concrete ramp without railings headup up to Building A
a high drone shot pointing North East showing dirt paths and building B with siding being installed and ready for roofing
a high drone shot pointing South showing many dirt paths and building A with most wood framing completed and ready for roofing
a high drone shot pointing South West showing many dirt paths across the property and the 4 buildings under construction
a high drone shot pointing West showing many dirt paths across the property and the 4 buildings under construction
a high drone shot pointing South showing many dirt paths across the property and the 4 buildings under construction
A drone shot pointing straight down over the entire property showing many dirt paths and heavy equipment along with the 4 buildings under construction
a drone shot facing South East showing Buildings A, B, C, and D along with a large retaining wall to the West of Building A
A view of Building D with the roofing and siding installed and work beginning on columns supporting the awning. Surrounded by dirt
Building B shown without roofing installed and partial siding completed surrounded by dirt and heavy equipment
a drone shot of buildings B, C, and D point to the East showing nearly completed metal roofing and wood siding surrounded by dirt
a large CMU block building with wood framed walls coming out of either side and a large steel truss sitting on the ground
A large CMU block building with wood framed walls extending out and a large steel truss sitting on the ground
two very large oak trees covered in fresh snow with heavy snow falling
a concrete pad with large retaining wall in the background burried under a few inches of fresh snow
a large building made of wood and CMU block under construction in an open field with heavy falling snow
several large earth moving vehicles in heavy falling snow in an open field
interior building under construction with framing and insulation and windows looking outside to falling snow
a large classroom building under construction with partial siding and metal roof in heavy falling snow
a man walking in a yellow "Otto Construction" high visibility vest in the snow toward two buildings under construction
the high roof of the inside of the new kindergarten wing with exposed hvac duct work and man lifts on the ground
a classroom building with large columns supporting the metal roof and horizontal siding being installed
a new classroom building with large columns supporting the roof overhang. horizontal siding is beginning to be added to the walls
plywood roofing with a short wood framed parapet wall with wood bracing installed
wood framing with white pvc pipe running between the open framed walls
rectangular concrete pads with two solid concrete walls behind them and a worker in safety gear with a toolbox
A large concrete block building and 2 long classroom buildings under construction.
A North view of Paradise Elementary with all 4 buildings and construction equipment
All 4 buildings at Paradise Elementary in various states of finish
An Aerial view facing South looking at Paradise Elementary under construction.  4 buildings are present in various states
a large concrete curved retaining wall surrounded by red dirt
a framed classroom with concrete floor and wood trusses and beams
a large wood framed class room with high ceiling and exposed rafters
a large wood framed building with a shed roof and dirt surrounding
a wood framed building with a large shed roof and exposed rafters
steel beams erected from the ground with a concrete block wall in the background
concrete footings with pillars sticking up
scaffolding around the multipurpose building with concrete block starting to be installed
a dirt pathway between two buildings, both in the framing stage.
the side of a new classroom wing with blue siding
a view of the side of a building showing blue siding and window openings
a building showing a gable end and wall board covering wood framing
wood framing of the roof and ventilation pipes hanging
ventilation ducting hanging from the ceiling of wood framing roof
a view in a building showing ceiling josts and framing above a concrete slab
a view of the roof with beams and rafters visable
Aerial overhead shots of the Paradise Elementary property showing the addition of foundations and buildings from September to November 2025
An aerial view facing South of the 4 new buildings at Paradise Elementary.  Two buildings are framed and the others have slabs poured.
An aerial image showing the 4 buildings under construction facing the South West.
An aerial view facing East of the two new classroom wings that have been framed.
The overhang of a new classroom building at Paradise Elementary with clouldy skies
Steel supports holding a steel beam in the middle of a new classroom building with some walls framed.
A view of the concrete slab of the new admin building that houses the office and cafeteria with clear blue skies.
Aerial overhead shots of the Paradise Elementary property showing the removal of the asphalt and trees